After successfully deploying their WaveEL wave energy device last year in Runde, Norway, our member Waves4Power is looking to redeploy before Easter this year. Right now the company is repairing and servicing their buoy in a local shipyard due to damage on the acceleration tube under the buoy, something which was discovered during a routine ROV inspection of the device.
“Timing is always difficult, but our ambition is to have the whole system deployed and connected before Easter,” – Ulf Lindelöf, Chief Executive of Waves4Power
Source: Tidal Energy Today